each specification, standard, and installation status, and so on based on the
inspection checklist actually at a site where the system is installed.
The inspector must record the results onto the inspection checklist during or after
filed inspection.
Sharing Inspection Results and Taking Corrective Actions
The inspector must share the inspection results (inspection checklist/corrective
actions) with an installation operator and, the installation operator must take the
corrective actions if necessary after reviewing the requirements.
Checking the Results of Corrective Actions
The inspector must check if the corrective actions are properly taken. If they are
not sufficient, the inspector must ask the installation operator to take the corrective
actions again.
Sharing the Results of Corrective Actions and Preparing Preventive Plan
After the corrective actions are all completed, the inspector must share the results
with the installation operator and relevant departments and prepare a preventive
plan to prevent the same or similar problems from re-occurring.

Construction Situation Checklist

Table 41. Construction Situation Check list
Category
Check Items
Installing
Appearance of equipment
Equipment
and mechanical parts
Placement of equipment
and mechanical parts
Leveling condition of
equipment and
mechanical parts
Validity of status and
specifications of fastening
bolt/nut/washer, and so on
Insulation status
Grounding
Installation of ground bar
Cable specification
Cabling
RF4402d Series Installation Manual v1.0
Copyright © 2018, All Rights Reserved.
Chapter 4 Inspect the Installation
Criteria
Equipment damage such as Dent,
scratch and crack, and so on
Maintenance and horizontal/vertical
placement
Horizontal/vertical status
Checking fasteners omission
Compliance with assembly order of
fasteners
Compliance with fastening torque value
Checking electrical contact between
insulators (insulation resistance tester)
Checking the separation of
communication/power/lightning
grounding
Checking the specification
Cable damage
Proper installation route
Compliance with the radius of curvature
Confidential
Result
Pass
Fail