Installation and commissioning flowchart

Plan the installation.
Check the ambient conditions, ratings, required
cooling air flow, input power connection, compatibility
of the generator, generator connection, and other
technical data.
Select the cables.
Check the units.
Check the type code indicated by the type
designation label with the original order.
Only intact units may be started up.
Check the installation site.
Route the cables.
Mount the cabinet line-up.
Check the insulation of the generator and the
generator cable.
Connect the power cables. Connect the control and
the auxiliary control cables.
Check the installation.
Commission the converter.
About this manual
contains the technical specifications of the converter, e.g. ratings,
Task
See
Technical data
Planning the electrical installation
Option manuals (if optional equipment is
included)
Mechanical installation
Hardware description
Mechanical
installation,
Technical data
Planning the electrical installation: Routing the
cables
Mechanical installation
Electrical
installation:
Checking the insulation of
the assembly
Mechanical installation, Planning the electrical
installation, Electrical installation
Installation checklist, Start-up
Installation checklist, Start-up
firmware manual
and appropriate