Bleed The System - ABB IRBT 4003S Product Manual

Track motion
Table of Contents

Advertisement

2.1.10 Bleed the system

Note!
If the steps below do not make any change start looking for other blockage than air trapped
in the system. See
1. Disconnect the hose between the pump and the divider valve at
2. Press the brake release button in the SMB/BRB for 1 second.
3. Reconnect the hose to the pump connection and disconnect it at
4. Hook up a manual pump to the divider valve and slowly pump in
5. Reconnect the hose to the divider valve.
6. Press the brake release button in the SMB/BRB for 1 second.
Figure 1 Lubrication system overview
Item Description
1
2
3
3HEA 800 970-001 Rev. D, Mars 2006
"Locating blockage in Series-Flo systems" on page 3 -
Action
the pump connection.
Release the button and wait 1 second then press the button
again.
Keep repeating until nothing but grease comes out of the hose.
the divider connection.
Repeat step 2 above.
grease, compatible with the grease in the lubrication system.
Keep pumping until the indicator pin starts moving in and out of
the divider valve.
Release the button and wait 1 second then press the button
again.
Repeat until the indicator pin starts moving in and out of the
divider valve.
Divider connection
Lubrication point
Pump connection
Maintenance instructions
Item Description
4
Indicator pin
5
Oil brush
Bleed the system
8.
Info/Illustration
See
Figure 1
See
Figure 1
See
Figure 1
See
Figure 1
3-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irbt 6003sIrc5M2004

Table of Contents