Mitsubishi Electric MELSEC iQ-R Series User Manual page 108

Melsec iq-r cc-link system master/local module
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

Line test
Check whether a Ver.1.10-compatible CC-Link dedicated cable is properly connected and data link can be performed with
slave stations.
Execute the test from the master station.
■Procedure
1.
Open the "CC-Link Diagnostics" window.
[Diagnostics]  [CC-Link Diagnostics]
2.
Double-click "Operation Test" in "Related Functions".
3.
Select "Loop test" under "Test Type".
4.
Select the slave station where the line test is performed under "Test Target".
• Select "All stations (Station 1-64)" to perform the test for all stations connected.
• Select "Specified station" to perform the test for the station specified. Specify the start station number when the number of
occupied stations is two or more.
5.
Click the [Execute] button to start the line test. After the line test is completed, the result is displayed on the right side of
the window.
• Do not write data to the buffer memory areas (buffer memory address: 5E0H and 608H) during line test.
• Do not perform a line test using a program and other peripherals at the same time. The line test may not be normally
performed.
When performing a line test, do not set the transmission speed of slave stations to auto-tracking. Set the
transmission speed of slave stations to the same as that of the master station. An error may occur during the
line test for slave stations whose transmission speed is set only to auto-tracking. If occurred, check the cable
connection status and the network line status by following the troubleshooting procedure.
4 TROUBLESHOOTING
106
4.3 Checking the System Status

Advertisement

Table of Contents
loading

Table of Contents