Interlocking For Busbar Earthing Switch Bb_Es - ABB REC670 Applications Manual

Relion 670 series, bay control
Hide thumbs Also See for REC670:
Table of Contents

Advertisement

Section 14
Control
14.4.7
14.4.7.1
14.4.7.2
370
Section 1
(WA1)A1
(WA2)B1
BH_LINE
IEC04000503 V1 EN-US
Figure 157:
Busbars divided by bus-section disconnectors (circuit breakers)
The project-specific logic is the same as for the logic for the double-breaker
configuration.
Signal
S1DC_OP
All disconnectors on bus-section 1 are open.
S2DC_OP
All disconnectors on bus-section 2 are open.
VPS1_DC
The switch status of disconnectors on bus-section 1 is valid.
VPS2_DC
The switch status of disconnectors on bus-section 2 is valid.
EXDU_BB
No transmission error from breaker and a half (BH) that contains the above
information.

Interlocking for busbar earthing switch BB_ES

Application
The interlocking for busbar earthing switch (BB_ES) function is used for one
busbar earthing switch on any busbar parts according to figure 158.
QC
en04000504.vsd
IEC04000504 V1 EN-US
Figure 158:
Switchyard layout BB_ES
The signals from other bays connected to the module BB_ES are described below.
Signals in single breaker arrangement
The busbar earthing switch is only allowed to operate if all disconnectors of the
bus-section are open.
A1A2_DC(BS)
B1B2_DC(BS)
BH_LINE
1MRK 511 401-UEN A
Section 2
A2
B2
BH_LINE BH_LINE
en04000503.vsd
Bay control REC670 2.2 IEC
Application manual
IP14164-1 v4
M15015-3 v7
M15053-4 v4
M15053-6 v5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents