Profibus Dp Master Equipment Side Settings - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

7.6

PROFIBUS DP master equipment Side Settings

This section explains how to set the PROFIBUS DP master equipment.
■1. Installing the GSD file for GOT
Install the GSD file for GOT to the configuration tool on the PROFIBUS DP master equipment side, and set the GOT as
slave equipment.
For how to acquire the GSD file for GOT, refer to the following.
■2. Communication configuration
Set the following communication parameters using the configuration tool on the PROFIBUS DP master equipment
side.
Master equipment
Slave equipment
*1
*2
7 - 8
7.6 PROFIBUS DP master equipment Side Settings
POINT
POINT
POINT
PROFIBUS DP master equipment
For the details of the PROFIBUS DP master equipment setting method, refer to the manual of the
used PROFIBUS DP master equipment.
7.5 Preparation of GSD File for GOT
Item
*1
Station No.
Transmission speed
*1*2
Station No.
Device setting
Make sure that the station No. does not overlap.
Align the setting of "Station No." on the GOT side with the station No. of the slave equipment.
7.4 GOT Side Settings
Setting range/Setting method
0 to 125
9.6kbps
19.2kbps
45.45kbps
93.75kbps
187.5kbps
500kbps
1.5Mbps
12Mbps
0 to 125
For the setting method, refer to the following manual.
Manual of PROFIBUS DP master equipment