Page 1
Multipoint Videographic Recorder User Guide IM/SM3000_4 SM3000...
Page 2
We are an established world force in the design and manufacture of instrumentation for industrial process control, flow measurement, gas and liquid analysis and environmental applications. Cert. No. Q05907 As a part of ABB, a world leader in process automation technology, we offer customers application expertise, service and support worldwide. EN 29001 (ISO 9001) We are committed to teamwork, high quality manufacturing, advanced technology and unrivalled service and support.
1 INTRODUCTION Functional Overview – Fig. 1.1. • 36 Recording Channels as standard, equally divided into up to 6 Process Groups, each with up to a maximum of 12 Recording Channels. • Four Alarms and two Totalizers are assigned to each Recording Channel. •...
Page 6
…1 INTRODUCTION Signal Sources – see Appendix 1 Process Group 1 Note. Signal sources Recording can be assigned to any Channels recording channel in any 1.1 to 1.6 process group. Analog Inputs A to F Chart View (Section 2.3) Bargraph View (Section 2.4) •...
2 OPERATION 2.1 Powering Up the Instrument When power is first applied to the instrument, its processor carries out a number of self-tests and displays the start-up screen. At the end of the start up sequence the instrument displays the last Operator View that was displayed when the instrument was powered down.
Page 8
…2 OPERATION …2.2 Displays and Controls – Figs. 2.1 and 2.2 Process Group 1 Process Group 5 Process Group 2 Process Group 6 Process Group 3 Group Overview Process Group 4 Instrument Status & Logs Notes. • Only process groups and views that have been enabled are displayed – see Section 4.5. •...
2 OPERATION… 2.3 Chart Views (Horizontal and Vertical – Fig. 2.3) Group Tag Status Bar Status Icon Digital On/Off Tag Units Short Channel Tag Current Date and Time Current Value (see on Page 9) Note 1 Newest Data Scale Bar 15:07:39 High Out Flow Rate Chart Trace Time Stamp...
Page 10
…2 OPERATION …2.3 Chart Views (Circular – Fig. 2.4) Operator Message Alarm Event Icon (see on Page 9) (appears for 1 second) Note 2 Global Alarm Group Tag Status Bar Status Icon Status Icon Current Date and Time Units Short Channel Current Value Time Stamp (see...
Page 11
2 OPERATION… …2.3 Chart Views Notes. 1. Current Values The Current Value, shown on the digital indicators at either the top (vertical chart view) or right hand side (horizontal chart view) of the screen, is the latest instantaneous value and its update rate is not affected by the recording sample rate. If the current value in the digital indicator is displayed in red, recording has been stopped for that channel –...
Page 12
…2 OPERATION …2.3 Chart Views Select the Configuration Level – see Section 4. Configuration Select the Setup Level – see Section 3. Setup Sign the chart electronically – see Section 2.3.1. Sign Chart Select Historical Review to view previously recorded data stored in the instrument's Historical Review onboard memory.
Page 13
2 OPERATION… …2.3 Chart Views Notes. While in Historical Review mode: • Recording of new data continues unless stopped from the Setup Menu – see Section 3.4. • Invalid historical data (e.g. when recording has stopped) is denoted by '– – –' in the digital indicator.
Page 14
…2 OPERATION …2.3 Chart Views Add one of 24 predefined Operator Messages (see Section 4.4.4) or one User-Defined Operator Messages Message to the alarm event log. 1 - 6 No message 7 - 12 No message If '<user defined>' is selected, a data entry keyboard first appears to enable the message 13 - 18 No message to be entered (see Fig.
Page 15
2 OPERATION… …2.3 Chart Views Chart Annotation If an alarm or operator message is obscuring part of a chart trace, use the Chart Annotation option to hide or display alarms and messages on the screen. Alarms Select the annotation required. indicates the annotations selected. ...
Page 16
…2 OPERATION …2.3 Chart Views Note. Applicable only to Vertical and Horizontal Chart views. Screen Interval Use the 'Screen Interval' to change the amount of data displayed on the screen. A longer 48 seconds/screen screen interval displays more data, a shorter screen interval displays data over a shorter 4 minutes/screen time period, but in more detail.
Page 17
2 OPERATION… …2.3 Chart Views Note. Applicable only to Vertical and Horizontal Chart views. Scales Select the scale(s) to be displayed in the scale bar at the top of the chart window. For digital channels, the On and Off tags are displayed at the corresponding position on the scale bar. A maximum of 3 scales can be selected for display at any one time.
Page 18
…2 OPERATION …2.3 Chart Views Note. Applicable only to Circular Chart view. Totalizer Stop/Go ch1.1 Volume Stop and start individual totalizers. ch1.2 Pressure ch1.3 In Flow Channel totalizers that have not been enabled in the Configuration level are greyed-out. A: Total Flow 1.3A ch1.4 Volume B: Total Flow 1.3B ...
2 OPERATION… 2.3.1 Electronic Signatures – Fig. 2.5 Entering an electronic signature is the equivalent to signing the chart of a conventional paper recorder. Local procedures may require the approval of a record by an authorized signatory; for this reason, an electronic signature is password protected. Invalid Password Entered (see...
…2 OPERATION 2.4 Bargraph Views – Fig. 2.6 Operator Message (appears for 1 second) Status Bar Status Icon Alarm Event Icon Short Channel Tag Digital On or Off tag, Current Value according to input status Engineering Units Engineering Range High Value Alarm Trip Level (not shown for slow and fast rate alarms)
Page 21
2 OPERATION… …2.4 Bargraph Views Select the Configuration level – See Section 4. Configuration Select the Setup level – see Section 3. Setup Add one of 24 predefined Operator Messages (see Section 4.4.4) or one User-Defined Operator Messages Message to the alarm event log. 1 - 6 No message 7 - 12...
Page 22
…2 OPERATION …2.4 Bargraph Views Reset the Maximum and Minimum value markers on one or all channels to the current Max/Min Reset value. ch1.1 Volume ch1.2 Pressure Notes. ch1.3 In Flow • These Maximum and Minimum values are for display purposes only. They are not saved ch1.4 Volume or archived and are not connected to the Totalizer Maximum and Minimum Values ch1.5 Valve...
2 OPERATION… 2.5 Digital Indicator View – Fig. 2.7 Alarm Event Icon Global Alarm Status Icon Status Bar Status Icons Short Channel Tag Current Value Engineering Units Alarm Indication (Flashing red border and alarm event icon indicates alarm unacknowledged. Continuous alarm event icon indicates alarm acknowledged) Channel Units Totalizer Units...
Page 24
…2 OPERATION …2.5 Digital Indicator View Select the Configuration level – see Section 4. Configuration Select the Setup level – see Section 3. Setup Add one of 24 predefined Operator Messages (see Section 4.4.4) or one User-Defined Operator Messages Message to the alarm event log. 1 - 6 No message 7 - 12...
Page 25
2 OPERATION… …2.5 Digital Indicator View Hide or display individual channel indicators for the process group currently displayed. Channel Select Channel Select Show All Channels for Group 1 Show All Configured Channels Select the channel digital indicator(s) to be displayed in the digital indicator view: Select…...
Page 26
…2 OPERATION …2.5 Digital Indicator View Channel Select Display all configured channel indicators for the process group currently selected for Channel Select display. Show All Channels for Group 1 Show All Configured Channels Display all configured channel indicators for all process groups. Channel Select Show All Channels for Group 1 Note.
2 OPERATION… 2.6 Process View – Fig. 2.8 Alarm Tag Alarm Trip Level Instantaneous Value Global Alarm Status Icon Alarm Event Icon (Alarm Inactive) Long Channel Tag (Short Channel Tag) Totalizer Tag Name Totalizer Value Alarm Event Icon (Alarm Active) Alarm Acknowledged Icon Min Average...
Page 28
…2 OPERATION …2.6 Process View Select the Configuration level – see Section 4. Configuration Select the Setup level – see Section 3. Setup Add one of 24 predefined Operator Messages (see Section 4.4.4) or one User-Defined Operator Messages Message to the alarm event log. 1 - 6 No message 7 - 12...
Page 29
2 OPERATION… …2.6 Process View Stop and start individual totalizers. Totalizer Stop/Go ch1.1 Volume Channel totalizers that have not been enabled in the Configuration level are greyed-out. ch1.2 Pressure ch1.3 In Flow Note. When a totalizer is not running (i.e. 'Stop' is selected), the corresponding totalizer ch1.4 Volume A: Total Flow 1.3A value is shown in red.
…2 OPERATION 2.7 Group Overview – Fig. 2.9 Operator Message Bargraph (appears for 1 second) Group Tag Status Bar Short Channel Tag Current Date and Time Newest Data Chart Trace Time Stamp Screen Interval Oldest Data Opens the Operator Menu for Selects Status View the current view Alarm Indication (Flashing red...
Page 31
2 OPERATION… …2.7 Group Overview Select the Configuration level – see Section 4. Configuration Select the Setup level – see Section 3. Setup Sign the chart electronically – see Section 2.3.1. Sign Chart Add one of 24 predefined Operator Messages (see Section 4.4.4) or one User-Defined Operator Messages Message to the alarm event log.
Page 32
…2 OPERATION …2.7 Group Overview Reset the Maximum and Minimum value markers on one or all channels to the current Max/Min Reset value. Group 1 Group 2 Notes. Group 3 • These Maximum and Minimum values are for display purposes only. They are not saved Group 4 or archived and are not connected to the Totalizer Maximum and Minimum Values Group 5...
2 OPERATION… 2.8 Instrument Status / Audit Log View – Fig. 2.10 otes. • The combined Instrument Status and Audit log view provides an overview of the instrument's status together with an historical log of system activity. • The two views are described separately in Sections 2.8.1 and 2.8.2. Instrument Status –...
…2 OPERATION 2.8.1 Instrument Status View – Fig. 2.11 Note. The Instrument Status view provides an overview of the instrument's status. Instrument Software Version Operating System Version Instrument Serial Number Instrument Tag Modules fitted to the instrument Amount of memory used on the archive media currently installed Cold junction temperatures...
2 OPERATION… 2.8.2 Audit Log View – Fig. 2.12 otes. • The Audit log view provides an historical log of system activity. • When the number of entries in the Audit log has reached that defined in 'Audit log size' (see Section 4.4.3), the oldest data is overwritten by the newest.
…2 OPERATION 2.9 Alarm Event Log – Fig. 2.13 ote. The Alarm Event log view provides an historical log of all alarm events in the sequence in which they occurred. To view the current status of all alarms, choose the Process View – see Section 2.6. Short tag of the alarm's source Global Alarm Status Icon View previous...
Page 37
2 OPERATION… …2.9 Alarm Event Log Select the Configuration level – see Section 4. Configuration Select the Setup level – see Section 3. Setup Select the entries to be displayed in the log. Indicates entries currently displayed. Filter Group 1 Alarms Notes.
…2 OPERATION 2.10 Totalizer Log – Fig. 2.14 otes. • The Totalizer log view provides an historical log of totalizer activity. To view the current totalizer status, choose the Process or Digital View. • When the number of entries in the Totalizer log has reached that defined in 'Totalizer log size' (see Section 4.4.3), the oldest data is overwritten by the newest.
Page 39
2 OPERATION …2.10 Totalizer Log Select the Configuration level – see Section 4. Configuration Select the Setup level – see Section 3. Setup Select the log entries to be displayed. indicates entries selected for display. Filter Notes. Group 1 Totalizers •...
3 SETUP 3.1 Introduction ote. Users with Setup access can: • Start/Stop recording. • Switch between primary and secondary recording rates. • Set archiving 'on-line' and 'off-line'. • View internal and external archive media file directories and delete external archive media files. 3.2 Accessing the Setup Level –...
3 SETUP… 3.3 Password Entry Enter Password 1) Select the required character using the , and keys. 2) Add the selected character to the password string using the key. Note. For security, all characters are displayed as ' '. 3) Repeat 1 and 2 until all characters have been entered. 4) Highlight the 'OK' button using the , and keys and press...
…3 SETUP 3.4 Setup Menu Use this menu to stop and start recording or change the sample rate for the channels in the Recording Control current Process Group. Group 1 Stop Group 2 The Primary sample rate is set typically to a relatively slow rate (depending upon process ...
Page 43
3 SETUP… …3.4 Setup Menu Places the archive media off-line. Recording of channel data into internal memory Off-line continues uninterrupted but archiving to the removable media is suspended until it is put on-line again. Notes. • Always set the external media Off-line before removing it. •...
…3 SETUP 3.5 Archiving Recorded data, logs and configuration files stored on the instrument's internal memory can be archived to files created on removable media. Parameters for archiving each process groups' data are configured independently. Note. To configure Archiving, refer to Section 4.5.6. 3.5.1 SmartMedia Handling and Care Note.
3 SETUP… 3.5.3 Inserting and Removing Media – Fig. 3.3 Note. When inserting the media into the instrument: Set the archive media off-line – • Ensure the media is the correct type for the instrument. see Section 3.4 • If SmartMedia option is fitted, ensure only 3.3V SmartMedia cards used.
…3 SETUP 3.5.4 Archive File Types 3.5.6 Channel Data Files Archive files created by the instrument are given filenames A new channel data file is created under the following conditions: automatically. Each type of archived file is given a different •...
3 SETUP… 3.5.7 Log files • External archive media can be set on-line (if a media card A new log file is created under the following conditions: is inserted) or off-line in the setup menu. • When an existing valid log file does not exist on an external •...
…3 SETUP 3.5.12 File Formats – Figs. 3.4 to 3.7 The archived data is stored in a secure binary encoded format. A separate file is created for each recoding channel. The log data is stored in an encrypted text format. The files can be read on a PC using the Company's DataManager data analysis software package. Note.
4 CONFIGURATION 4.1 Introduction This section details the configuration of the instrument locally using the front panel membrane switches. A configuration file can also be created on a PC and transferred to the instrument via one of the archive media options. In addition, up to 5 different configurations can be stored in internal memory and restored when required.
Page 51
4 CONFIGURATION… …4.1.2 Configuration Access – Figs. 4.1 and 4.2 Invalid Password Entered (see Note in Fig. 3.1 on page 37) Configuration Configuration Level Operator 1 Protected (see Section 4.1.1) Operator 2 Operator 3 Operator 14 Valid Password Configuration Level Operator 15 Entered Unprotected...
Page 52
…4 CONFIGURATION …4.1.2 Configuration Access – Figs. 4.1 and 4.2 Note. The Internal Security Switch is used to access the Configuration level when 'Configuration security type' is set to 'Internal switch protected' – see Section 4.4.2. use the switch to access the Configuration level when Do Not 'Configuration security type' is set to 'Password protected' (default setting) unless the Password has been forgotten.
4 CONFIGURATION… 4.2 Overview of Configuration – Fig. 4.3 Select the required parameter using the keys. Press the key to edit selected parameter. Select 'Common' from the Configuration menu Use the keys to select the next required tab Press the key to display the menu.
…4 CONFIGURATION 4.3 Making Changes to Parameters – Figs. 4.4 to 4.7 Configuration Tab Edit Button Parameter Copy Window Parameter Value Parameter Selection Window – Note 1 below Use the key to advance Use the keys to to the next channel and the highlight a different selection.
Page 55
4 CONFIGURATION… …4.3 Making Changes to Parameters – Figs. 4.4 to 4.7 keys to highlight an item and press to select it. Note. Items not selected are indicated by an X in the parameter value window. 1 2 3 4 X X X X X X X X Highlight text box and use keys to position cursor to edit text as required.
Page 56
…4 CONFIGURATION …4.3 Making Changes to Parameters – Figs. 4.4 to 4.7 Select the tab appropriate to the data to be copied. Press the key to open the menu and use the keys to select the copy facility. Source of copied data Use the keys to select copy destinations.
Page 57
4 CONFIGURATION… …4.3 Making Changes to Parameters – Figs. 4.4 to 4.7 e t l i r a z i r s t i c i r ...
Page 58
…4 CONFIGURATION …4.3 Making Changes to Parameters – Figs. 4.4 to 4.7 n i t r a l l l A r a l r a l y l i ...
Page 59
• Selecting 'Save as Current Configuration' suspends recording for a short time while the new configuration is implemented. • When saving the current configuration to internal storage, the file is saved automatically with the 'SM3000.cfg' filename together with a <time><date><instrument tag>.cfg filename.
…4 CONFIGURATION 4.4 Common Configuration Fig. 4.8 Selecting Common Configuration 4.4.1 Setup Configuration type is fixed as 'Basic'. Enter the number of process groups required. The number of channels assigned to each process group is dependent upon the number of groups selected – see Table 4.2 below.
Page 61
4 CONFIGURATION… ...4.4.1 Setup Enable or disable the process group overview display. Note. If 'Number of groups' is set to 1, group overview is not available. Select 'Enable' to enable group overview. Select 'Max and Min' and 'Alarms' to enable maximum and minimum markers and alarms for display as required.
Page 62
…4 CONFIGURATION ...4.4.1 Setup Set the current date and time. Note. If daylight saving is required, enter the settings (see next page) setting the time and date as the operation before of the internal clock is affected by the daylight saving settings.
Page 63
4 CONFIGURATION… ...4.4.1 Setup Select the daylight saving method. Note. Changes to daylight saving are effective immediately a method is selected. However, if 'Cancel' is selected upon exiting Configuration Mode (see Fig. 4.7, page 57), the last saved daylight saving settings are restored. g i l g i l c i t...
…4 CONFIGURATION 4.4.2 Security Change user names, access privileges and passwords. Notes. • User 1 is the System Administrator and is able to change user names/access privileges and enter initial passwords for all users. Other users cannot change their user names and access privileges once set by User 1. All users may change their own passwords.
Page 65
4 CONFIGURATION… …4.4.2 Security Enter the number of consecutive incorrect password entries allowed by a user. If the number of incorrect entries exceeds this limit, the user's access privileges are de-activated and can be reinstated only by the System Administrator (User 1). Passwords have a maximum length of 20 characters.
…4 CONFIGURATION 4.4.3 Logs Set the maximum number of entries in each instrument log. Note. Changing the log size deletes the current log entries. records all process alarm transitions Alarm Event log (inactive to active, unacknowledged to acknowledged or active to inactive), real-time events and Operator Messages –...
4 CONFIGURATION… 4.4.4 Operator Messages Operator messages can be triggered via the Operator Menus or a digital signal. Message Tag Enter the message text – 20 characters maximum. Group Select the group(s) to which the message is to apply. Source ID Select the internal or external signal source used to add the tag to the Alarm Event log.
…4 CONFIGURATION 4.4.5 Ethernet The Ethernet module fitted to the instrument contains an embedded web server enabling the instrument's data and status to be viewed remotely using an internet browser on a PC. The web server supports up to eight independant connections. Notes.
4 CONFIGURATION… 4.4.6 e-mail The instrument can be configured to send e-mails to a maximum of 6 recipients in response to certain events. The addressees can all subscribe to the same SMTP server or the instrument can be configured to send e-mails via 2 different SMTP servers to a maximum of 3 addressees per server.
Page 70
…4 CONFIGURATION …4.4.6 e-mail Enter the IP address of the SMTP server through which e-mails are to be routed. Enter the address(es) of the e-mail recipient(s). Select the options to enable: Channels Report A summary of all enabled channels is included in the e-mail, together with their instantaneous values.
4 CONFIGURATION… 4.5 Process Group Configuration Process Group 1 Process Group 2 Process Group 3 (see Note below) Note. The number of Process Groups and associated channel options displayed depend on the number of Process Groups selected during common configuration setup – see Section 4.4.1. Fig.
Page 72
…4 CONFIGURATION ...4.5.1 Setting the Recording Parameters The instrument can be configured to sample all recording channels in the group and store the data in internal memory and external archive media (if archiving is enabled) at two rates, Primary and Secondary. The Primary sample rate is active during normal process operating conditions and is set typically to a relatively slow rate (depending upon process recording requirements) in order to maximize internal memory and external archive media capacity.
4 CONFIGURATION… 4.5.2 Configuring the Chart View Major Chart Divisions Minor Chart Divisions Scale Bar Time Stamp Chart Trace Chart Divisions Screen Interval Operator Message Annotation Alarm Event Annotation Vertical Chart Screen Interval Horizontal --> Chart Horizontal <-- Chart Circular Chart...
Page 74
…4 CONFIGURATION …4.5.2 Configuring the Chart View Select Horizontal --> (Chart runs left to right with scale bar on left), Horizontal <--(chart runs right to left with scale bar on right), Vertical or Circular chart view. Select the annotations to be displayed on the chart. Alarm events and operator messages are displayed on the chart adjacent to the point at which the alarm occurred –...
Page 75
4 CONFIGURATION… …4.5.2 Configuring the Chart View Select the amount of historical data to be displayed on the screen. Available selections are limited by the sample rate Vertical and Horizontal Chart Views only selected – see Page 70 and Table 2.1 on page 13. Circular Chart View only Select the required trace width in pixels (Vertical and Horizontal Chart views only).
…4 CONFIGURATION 4.5.3 Configuring the Bargraph View Engineering Range High Value Alarm Trip Level (not shown for slow and fast rate alarms) Maximum Value (solid color) Engineering Range Middle Value Instantaneous Value Minimum Value (white fill) Engineering Range Low Value Analog Channels Digital Channel...
4 CONFIGURATION… 4.5.4 Configuring the Process View Alarm Alarm Trip Channel Long Tag Name (Short Tag Name) Level Totalizer Tag Totalizer Average Name Value Values since last Totalizer Reset or Totalizer wrap. Updated only if the Totalizer is Enabled and Running. Set to 'On' to enable the operator to display the Process view.
…4 CONFIGURATION 4.5.5 Configuring the Digital Indicator View Short Channel Tag Channel Units Current Value Totalizer Units – see below Note Units Totalizer Value – see below Note ote. Displayed only if the totalizer is enabled for that channel (see Section 4.6.5) Alarm Status display (see below).
Page 79
4 CONFIGURATION… …4.5.5 Configuring the Digital Indicator View Select the channels to be accessible from the Digital Indicator view. Note. Channels that are not enabled are greyed-out in the Digital Indicator view menu.
…4 CONFIGURATION 4.5.6 Archiving Introduction Recorded data, logs and configuration files stored in the instrument's internal memory can be archived to files created in removable media. Parameters for archiving data in each process group are set up independantly. For a full description of archiving and archive file formats, refer to Section 3.5. Sample Rates –...
4 CONFIGURATION… 4.6 Channel Configuration Process Group 1, Channels 1.1 to 1.12 Note. The number of Process Groups and associated channel options displayed depend on the number of Process Groups selected during common configuration setup – see Section 4.4.1. Fig. 4.13 Recording Channel Configuration...
…4 CONFIGURATION 4.6.1 Recording Channel Setup •1 Select the signal source for the selected channel. This can be any external analog or digital signal – see APPENDIX 1 for full list. Note. The tabs change according to the selection made. A –...
Page 83
4 CONFIGURATION… …4.6.1 Recording Channel Setup Select the filter to be applied to the electrical input prior to •1 sampling. Notes. • Applicable to analog sources only. • Filters are applied to the recorded values shown on the chart view only, not to instantaneous values displayed on the channel indicators or bargraphs.
…4 CONFIGURATION 4.6.2 Analog Input Configuration Notes. • The 'Analog I/P' tab is displayed only if 'Source ID' for the Recording Channel is set to an analog signal source – see Section 4.6.1. • If an analog input is assigned to more than one recording channel, changes to any of its parameters and tags are applied to each channel the input is assigned to.
Page 85
4 CONFIGURATION… …4.6.2 Analog Input Configuration Set the required electrical range. Notes. • Applicable only to mA, mV, V and Resistance input types. • When an input is connected through an external voltage divider (see above), set the electrical range low Warnings and high values to the actual voltage applied to the divider, not the voltage after it has been divided down.
Page 86
…4 CONFIGURATION …4.6.2 Analog Input Configuration Enter the tag name to be displayed on channel indicators and •1 used to identify the channel in archive files (8 characters max.). Note. Tags with a high percentage of capital letters and wide characters such as 'W' or 'M' may appear truncated in some Operator Views.
4 CONFIGURATION… 4.6.3 Digital Input Configuration ote. The 'Digital I/P' tab is displayed only if 'Source ID' for the Recording Channel is set to a digital signal source – see Section 4.6.1. Note. This parameter is displayed only if 'Input type' on the •1 'Analog I/P' tab is set to 'Volt free digital input'.
…4 CONFIGURATION 4.6.4 Alarm Configuration Hysteresis Trip Point Hysteresis Process Variable Alarm On High Process Alarm Off Alarm On Low Process Alarm Off Fig. 4.14 High/Low Process Alarms Trip Point Hysteresis Process Variable Alarm On Alarm Latched Alarm Off Alarm acknowledged by operator High Latch Alarm Action Process...
Page 89
4 CONFIGURATION… …4.6.4 Alarm Configuration Process Variable Trip Point Hysteresis Hysteresis Trip Point Process Variable Alarm On Alarm On Alarm Off Alarm Off Alarm acknowledged Alarm acknowledged by operator by operator High Annunciate Alarm Action Low Annunciate Alarm Action Fig. 4.16 High/Low Annunciate Alarms Deviation exceeded –...
Page 90
…4 CONFIGURATION …4.6.4 Alarm Configuration Process variable goes Process variable goes Process variable goes above trip point but above trip point but Process variable goes above trip point, alarm is alarm is not activated alarm is not activated below trip (hysteresis) activated (alarm is because enable signal because alarm delay...
Page 91
4 CONFIGURATION… …4.6.4 Alarm Configuration ote. The Alarm Configuration tabs are displayed only if 'Source ID' for the Recording Channel is set to an analog signal source – see Section 4.6.1. Set the alarm type: High/Low process – see Fig. 4.14 High/Low latch –...
Page 92
…4 CONFIGURATION …4.6.4 Alarm Configuration Set the minimum or maximum amount of deviation allowed within the alarm 'Period' (see below) before the alarm is activated. Note. Rate alarms only – see Fig. 4.17. Set the time period over which the deviation is measured. For fast rate alarms, the alarm becomes active if the value changes by more than the devation value within the alarm period.
4 CONFIGURATION… 4.6.5 Totalizer Configuration Notes. • Current totalizer values are displayed in the Circular Chart, Digital Indicator and Process Views – see Sections 2.3, 2.5 and 2.6 (Operation), and Sections 4.5.2, 4.5.5 and 4.5.4 (Configuration) respectively. • For analog sources, the total value of a signal is calculated by counting pulses produced at a rate proportional to the input. For digital sources, off/on transitions are counted and scaled to produce a batch total.
Page 94
…4 CONFIGURATION …4.6.5 Totalizer Configuration Set the value the totalizer counts from and the value applied when the totalizer is reset. Set the value at which the totalizer stops or wraps. Note. A counter configured to count up must have a 'Preset count' value lower than the 'Predetermined count' value.
Page 95
4 CONFIGURATION… …4.6.5 Totalizer Configuration Set the required totalizer count rate. The count rate is determined by the maximum number of Analog Input Sources only – see Section 4.6.1 engineering units (or pulses) per second and the smallest totalizer increment: engineering full scale value (rate) engineering units (in seconds) –...
…4 CONFIGURATION 4.7 I/O Module Configuration Note. The instrument detects the type of module fitted in each position automatically. Fig. 4.19 I/O Module Configuration 4.7.1 Analog Inputs Set the mains rejection frequency used to filter electrical noise induced on the signal lines by power supply cables. Input Adjustment Manually fine-tune inputs to remove process offset errors or system scale errors.
4 CONFIGURATION… …4.7.1 Analog Inputs Offset adjust / Span adjust Manually fine-tune the offset adjust and span adjust values to remove process errors. These are calculated values applied to the raw input signal. Note. If simulating thermocouple inputs, connect the millivolt source using appropriate compensating cable –...
…4 CONFIGURATION 4.7.3 Hybrid Modules Select a digital output source. Notes. • A digital output source is the internal digital source used to activate/de-activate a digital output. • If a digital output is used to provide a totalizer count pulse, the maximum pulse frequency is 5Hz.
4 CONFIGURATION… …4.7.3 Hybrid Modules Select the analog output source. Note. The analog output source can be any internal or external analog signal. Set the required analog output engineering range. Note. The 'Engineering low' and 'Engineering high' settings are the engineering values corresponding to the 'Electrical low' and 'Electrical high' values below.
…4 CONFIGURATION 4.8 Functions Fig. 4.20 Functions Configuration 4.8.1 Custom Linearizers Use the keys to highlight the linearizer to be adjusted. Use the key to open the 'Adjust custom linearizer' screen. Use the keys to highlight the point to be modified. Press the key to open the digipad to change the position of the point.
4 CONFIGURATION 4.8.2 Custom Chart Zones For each custom chart zone, set the lower and upper margins of the zone, between 0.00 and 100.00%. If the lower and upper margins for Custom zone 1 Example. are set to 10 and 25% respectively, the trace for a recording channel assigned to 'Custom 1' (see Section 4.6.1) is confined to that area of the chart that lies between 10 and 25% of:...
5 INSTALLATION EC Directive 89/336/EEC In order to meet the requirements of EC Directive 50C 89/336/EEC for EMC regulations, this product must not (122F) Max. be used in a non-industrial environment. 0C (32F) Min. End of Life Disposal A – Within Temperature Limits •...
…5 INSTALLATION 5.3 Electrical Connections – Fig. 5.5 Warnings. • The instrument is not fitted with a switch therefore a disconnecting device such as a switch or circuit breaker conforming to local safety standards must be fitted to the final installation. It must be fitted in close proximity to the instrument within easy reach of the operator and must be marked clearly as the disconnection device for the instrument.
Page 105
5 INSTALLATION… …5.3 Electrical Connections – Fig. 5.5 Module Positions AC Power Supply Earth (Ground) Stud – see on page 102 Warnings Continuity/ External Voltage Divider – Receive LED on page 104 Warnings Transmit Ethernet – RJ45 Connector A, B, C, D, E, F E, F, G, H G, H Transmitter...
…5 INSTALLATION 5.4 Analog Inputs 5.4.1 Current and Voltage – Fig. 5.6 – – – Warnings. 10 Resistor supplied Voltage divider • When input 'Type' is set to 'Volts' (see in accessory pack. (GR2000/0375) Section 4.6.2), input signals with voltages required for greater than 2V (standard inputs) or 1V voltage inputs –...
5 INSTALLATION… 5.5 Mains Power Connections – Fig. 5.8 5.6 Relay Output Board Connections – Fig. 5.9 Fuse, Notes. 400mA, Type T • The maximum total combined current flowing Line through the relays is 36A. The maximum individual 85 min. to 265V max. Neutral relay current is 5A.
…5 INSTALLATION 5.7 Hybrid I/O Module Connections 5.7.3 Analog Output Connections – Fig. 5.12 5.7.1 Digital Output Connections – Fig. 5.10 Two analog outputs are provided on the Hybrid option board. Six digital outputs are provided on the Hybrid option board. –...
5 INSTALLATION… 5.8 Ethernet Network Connections 5.8.1 Direct Connection to a Computer – Figs. 5.13 and 5.14 Note. Ensure that permission has been granted for installation of new devices on the network. If in doubt, Note. A crossover cable required this consult the System Administrator before connecting configuration.
…5 INSTALLATION 5.8.2 Connection to a Network Hub – Fig. 5.15 Fig. 5.15 Connection to a Network Hub 5.8.3 Connection to a Dial-Up Router – Fig. 5.16 Router Router WAN / Internet Fig. 5.16 Connection to a Dial-Up Router 5.8.4 Connection to an Internet Gateway – Fig. 5.17 Internet Gateway Fig.
APPENDIX 2 – STORAGE CAPACITY A2.2 Archive Storage Capacity Note. The stotage capacity times shown are for archiving of 12 channels. If more or less channels are enabled, divide or multiply the times accordingly, e.g. if 24 channels are enabled, halve the given times; if 6 channels are enabled, double the given times.
APPENDIX 3 – DEFAULT SETTINGS… A3.1.3 Recording Channels …A3.1.3 Recording Channels Setup Totalizers Source indentifiers Count enable Channels 1.1 to 1.6 Analog I/P A1 to A6 Wrap enable Wrap on All other channels None Channel x.xA totalizer tag Total flow x.xA Trace color Channel x.xB totalizer tag Total flow x.xB...
APPENDIX 3 – DEFAULT SETTINGS A3.2.5 QSRTD_C …A3.2.7 QSDEMO As A3.2.3 QSTHC_C, except: Analog inputs Analog inputs Type Simulated sinewave Type Resistance thermometer Engineering low Linearizer type PT100 Engineering high 10.0 Engineering Units C Ch1.1 A3.2.6 QSRTD_F Ch1.2 As A3.2.3 QSTHC_F, except: Ch1.3 Gal/h Analog inputs...
APPENDIX 4 – ETHERNET A4.1 Introduction Other protocols that operate at the same level are the Address A4.1.1 Ethernet Communications Resolution Protocol (ARP) and the Internet Control Message Protocol (ICMP). Ethernet is a form of electronic communication that has been adopted as a worldwide networking standard.
To obtain the FTSP (FTS.exe), enter the following (without spaces) in a web browser's address bar: http://search.abb.com/library/ABBLibrary.asp?DocumentID= FTS.exe&LanguageCode=en&DocumentPartId=&Action=Launch To obtain the FTSP User Guide (IM/SMFTS), enter the following (without spaces) in a web browser's address bar: http://search.abb.com/library/ABBLibrary.asp?DocumentID=...
Page 120
…APPENDIX 4 – ETHERNET A4.3.1 FTP Access via MS-DOS The following FTP commands are used to communicate with the To use FTP access: recorder: Change directory on the server 1) If the DOS window is not open, click the 'Start' button on the task bar and select 'Run'.
Page 121
APPENDIX 4 – ETHERNET… A4.3.2 FTP Access via Internet Explorer 3) Enter the 'User Name:' and 'Password:' for the recorder (see Section 4.4.5), and click on 'Login'. The contents of the recorder, that looks similar to the following, is displayed: Note.
Page 122
…APPENDIX 4 – ETHERNET …A4.3.2 FTP Access via Internet Explorer A4.3.3 Using FTP Access with DataManager 7) Select the 'Copy To Folder' option. The 'Browse for Folder' The Company's DataManager software can be used with FTP to window is displayed: access data files that have been saved to the archive media (SmartMedia or Compact Flash card) inserted in the recorder.
APPENDIX 4 – ETHERNET… A4.4 Using the Recorder's Web Server – Figs A4.8 to A4.18 Figs. A4.8 to A4.18 are examples of the page views available from the recorder's web server. Recorder's IP address Click to log on to the recorder to enable Instrument tag configuration access...
Page 124
…APPENDIX 4 – ETHERNET …A4.4 Using the Recorder's Web Server – Figs A4.8 to A4.18 Latest value of channel Alarm status of each channel – refer to rear foldout Channel tags and units of measure for identification of alarm icons Primary and secondary sample rates...
Page 125
APPENDIX 4 – ETHERNET… …A4.4 Using the Recorder's Web Server – Figs A4.8 to A4.18 Totalizer preset Current secure total predetermined values Current batch total Current totalizer status Totalizer tag Start, stop or Configured totalizers, reset the color coded for each totalizers channel (a warning...
Page 126
…APPENDIX 4 – ETHERNET …A4.4 Using the Recorder's Web Server – Figs A4.8 to A4.18 Module A Cold junction analog inputs compensation reading for module A Module B analog inputs Cold junction compensation reading for module B Fig. A4.14 Analog Signals Page Current status of digital signals List of all digital...
Page 127
APPENDIX 4 – ETHERNET… …A4.4 Using the Recorder's Web Server – Figs A4.8 to A4.18 Enter a valid FTP username – see Section 4.4.5 Enter an associated FTP password – see Section 4.4.5 Enter an Operator Message to be sent to the recorder (maximum 20 characters) Enter an Instruction to be sent to the Operator (maximum 160 characters)
Page 128
…APPENDIX 4 – ETHERNET …A4.4 Using the Recorder's Web Server – Figs A4.8 to A4.18 Change or retain security configuration – see Fig 4.1 Select a configuration previously saved to internal storage or select a QuickStart template – see APPENDIX 3.2 Change the recorder's current date and time setting Note.
APPENDIX 4 – ETHERNET A4.5 Glossary of Terms Open system The following terms have specific meanings within the Ethernet A system conforming to specifications and guidelines that environment: are 'open' to all. This allows any manufacturers' equipment that comply with these standards used...
APPENDIX 6 – ERROR & DIAGNOSTICS INFORMATION Error Message Action "The system has not finished updating the files in the storage card folder. Re-insert the storage card immediately and press the key to clear Please re-insert the storage card now. WARNING: Failure to do so may the error message.
Page 135
SYMBOLS AND ICONS Process Group Name Status Icons Process Group 1 Configuration Historical Review Active External archive media on-line (green icon, shaded area indicates % used) Process Group 6 Configuration External archive media off-line (greyicon, shaded area indicates % used) Channel 1.1 to 1.6 Configuration Media update in progress.
Page 136
Service and Repair Centre. – Food & Beverage – Manufacturing United Kingdom – Metals and Minerals – Oil, Gas & Petrochemical ABB Limited – Pulp and Paper Tel: +44 (0)1480 475321 Fax: +44 (0)1480 217948 Drives and Motors United States of America •...
Page 137
MODBUS protocol is a registered trademark of Schneider Electric Lotus 1,2,3 is a registered trademark of the Lotus Development Corporation ABB has Sales & Customer Support The Company’s policy is one of continuous product improvement and the right is reserved to modify the expertise in over 100 countries worldwide information contained herein without notice.