Operation Test; Starting The System; Turning Off The System - Samsung ELSR362-00004 Installation Manual

Res 3.6 kwh all in one
Hide thumbs Also See for ELSR362-00004:
Table of Contents

Advertisement

8. Operation Test

8. Operation Test

8.1 Starting the System

After completing the installation, turn on the AC circuit breaker and the DC disconnect
switch installed in the distribution box. (See the Section 5.7)
Check the system check message on the front LCD screen.
After finishing the system check, check the system, the PV, and the battery status.
[Figure 8-2: Standby state indication screen before the EMS command]
You will receive the command from the EMS to convert to operation mode.
For individual operation mode screen, refer to 8.3.
If there is an event message received, refer to 8.3.7.

8.2 Turning off the System

To turn-off the system, push down the manual AC circuit breaker and the DC disconnect
switch in the distribution box.
60
[Figure 8-1: Initial indication screen on power on]
Australia (Eng.) 05/2015. Rev1.1

Advertisement

Table of Contents
loading

Table of Contents