Powering On the CPE

Step 1
Step 2

Where to Go Next

78-11469-01
Connect the AC cord to a power outlet.
Ensure that the power LED turns green. If the power LED does not turn green,
refer to
Chapter 3, "Troubleshooting"
The READY link and ETH link LEDs turn on when the appropriate equipment is
connected.
CPE configuration, data speed settings, and monitoring are controlled from a
Catalyst 2912 LRE XL or Catalyst 2924 LRE XL switch. Refer to the Catalyst
2900 Series XL and Catalyst 3500 Series XL Software Configuration Guide for
additional information.