Powering On The Switch - Cisco WS-C2950-12 Hardware Installation Manual

Desktop switch
Hide thumbs Also See for WS-C2950-12:
Table of Contents

Advertisement

Chapter 2
Installation

Powering On the Switch

Figure 2-20 Installing a GigaStack GBIC Module in a Switch
Metal flap door
C at al y st 2
9 5 0
1
SE RIE S
2
GigaStack
GBIC module slot
GBIC module

Powering On the Switch

Before connecting the AC power cord, a DC-input power source, or the
Redundant Power System (RPS) to the switch, make sure that you have started the
terminal-emulation software (such as ProComm, HyperTerminal, tip, or minicom)
from your management station.
If you are using the AC power cord, connect the AC power cord to the AC power
connector and to an AC power outlet.
If you are using the DC-input power source, see the
"Connecting to DC Power"
section for installation instructions.
If you are using an RPS, refer to the documentation that came with your RPS for
installation instructions.
Attach only the Cisco RPS 300 (model PWR300-AC-RPS-N1) to the RPS
Warning
receptacle.
For POST information, see the
"Running POST" section on page
2-32.
Catalyst 2950 Desktop Switch Hardware Installation Guide
2-22
78-11157-03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 2950

Table of Contents