Commissioning

DANGER
7.1

Density Monitor

7.1.1

Connecting the Cable

REV6
/REV7
Serious personal injury or property damage can result during
commissioning if the equipment is live or energized.
Therefore:
- Make sure that the circuit breaker is disconnected from
the high voltage system.
- Make sure the circuit breaker is earthed (grounded).
The five safety rules of electrical engineering must be followed:
- Disconnect the equipment from the power supply.
- Install safeguards to ensure that the power cannot be turned on
again.
- Confirm that the equipment is de-energized.
- Earth (ground) and short-circuit the equipment.
- Cover or provide barriers for adjacent energized equipment.
The cable is already connected to the density monitor. The cable
entry gland is located on the rear or underside of the operating me-
chanism.
• Insert the cable into the operating mechanism through the cable
gland and connect it according to the schematic diagram.
OI 248 (EN)
C
OMMISSIONING
43