Transport At The Installation Site - GE GL 310 F3/4031 P/VR Operating Instructions Manual

High voltage circuit breaker
Table of Contents

Advertisement

H
S
ANDLING
ULFUR
3.3

Transport at the Installation Site

CAUTION
DANGER
16
H
EXAFLUORIDE
All pressure specifications are given in terms of relative pressure
(p
).
e
Pole columns are shipped at a gas gauge pressure of approxima-
tely 0.03 MPa (p
) (0.3 bar).
e
The bursting of pressurized parts such as insulators or bushings
may result in property damage or personal injury.
Therefore:
- Do not move pole columns if the gas gauge pressure is
higher than the shipping pressure.
OI 248 (EN)
REV6
/REV3

Advertisement

Table of Contents
loading

Table of Contents