MAN0530 Issue 15 - 07/17
2104M0506
3. INSTALLATION AND OPERATION
3.5 UNPACKING
(1)
Carefully unpack the equipment, observing any instructions that may be printed on or
contained within the packaging.
(2)
Check the contents for damage and against the packing note for deficiencies.
In the event of damage or loss in transit, notify the carrier and Honeywell Analytics or
your local agent immediately.
The gas detector consists of the following items:
Where alternative component sizes are given the size depends on the version of unit,
i.e.mid/long range version or short range version.
1 x Receiver Unit
2 x Mounting Plates
2 x Pivot Blocks
(with grub screws)
NOTE: REFER TO APPENDIX 4 FOR COMPONENT IDENTIFICAITON AND FOR SPECIAL
INSTRUCTIONS ON INSTALLATION, ALIGNMENT AND COMISSIONING OF THE
MARITIME BRACKET.
1 x Transmitter Unit
2 x Mounting Brackets
(with grub screws)
4 x Adjustment Clamps
(with grub screws)
28
Searchline Excel