Installation 762 Vito Interface; Installation 762 Vito Interface Directly On Vito Probe / Mrt; Standard Version (Without Optional Ip Adapter) - Honeywell Enraf VITO 762 Installation Manual

Table of Contents

Advertisement

2.5

Installation 762 VITO Interface

The VITO interface is typically installed directly on top of the VITO probe / MRT (refer to
section 2.5.1)
For installations where the VITO interface cannot be installed directly on the VITO probe /
MRT (e.g. when the adjustment pipe is installed close to a stilling well or other mechanical
obstruction), it is possible to install the VITO Interface in close proximity of the VITO probe
(refer to section 2.5.2).
For VITO MPT probes with six (6) or less Pt100 sensors, there is no need for the VITO
Interface when used in combination with the 990 series SmartRadar FlexLine (refer to
section 2.5.3).
2.5.1

Installation 762 VITO Interface directly on VITO probe / MRT

2.5.1.1

Standard version (without optional IP adapter)

Refer to figure 7a.
Turn the remaining nut (1) for appr. 25 mm
(1") on the adjusting pipe and place the
remaining lock washer (2) on top of the nut;
Unpack the VITO Interface (preferable on
the tank);
Apply Teflon
on the first 20 mm (3/4") of the adjusting
pipe;
Remove the cover from the VITO Interface
enclosure;
Feed the flying leads through the lower
opening of the VITO Interface enclosure.
Note:
With 762 CEPS Interface and 365
Combi probe, it may be required to
remove the front (temperature) module
to feed the flying leads into the
762 CEPS enclosure (refer to section
3.2.3 and figure 10);
Make sure the probe wiring is not
damaged when mounting the VITO
enclosure on the threaded pipe.
Turn the VITO Interface onto the VITO probe's adjusting pipe. The VITO
Interface will fit for appr. 12 to 15 mm (½" to
Prevent the VITO Interface from turning by fastening lock nut (1) with lock
washer (2);
®
tape or a suitable pipe sealant
Caution
Installation guide 762 VITO interfaces & VITO probes
Mechanical installation
Figure 7a Installation VITO Interface
(standard version)
5
/
") onto the adjusting pipe;
8
P
P
B
B