Tram Module Communication Test; Checkout Procedures Completion; Pm Form - GE Transport Pro Service Manual

Patient monitor
Hide thumbs Also See for Transport Pro:
Table of Contents

Advertisement

Tram Module Communication Test

Checkout Procedures Completion

PM Form

Revision A
Maintenance: Checkout Procedure
Complete the following steps in the order presented. Failure to attain
any of the listed results indicates a malfunction.
1. Confirm that all components of the monitoring system are correctly
connected as described in Chapter 3, Installation.
2. Connect the Tram module interconnection cable to the Tram module
and to the monitor.
3. Place the Tram module into the chute. Verify that the power
indicator illuminates.
4. Configure the monitor display with as many waveforms as possible.
Refer to the appropriate monitor operator's manual, if necessary.
5. The waveforms should look clean (no noise).
This completes the checkout procedure.
1. Disconnect all test equipment.
2. Return the monitor to service.
Due to continuing product innovation and because specifications in this
manual are subject to change without notice, a PM form is not included
with this manual. For the latest PM form regarding this product, contact
GE Service.
If repairs/adjustments were made or any parts replaced, describe this in
the area provided on the PM form.
Also include comments regarding any unusual environmental conditions
that may affect the operation or reliability of the equipment in the area
provided on the PM form.
On the following page a repair log is included for your convenience to
record the repair history of this product.
Transport Pro Patient Monitor
2012659-002
4-29

Advertisement

Table of Contents
loading

Table of Contents