Cisco Surge-Gap Multimedia Tap Installation And Operation Manual page 59

Table of Contents

Advertisement

11 After the twisted pair wires are connected and PTCs are inserted, apply RTV to
fill the compartment (area near the tie wrap) and seal the ends of the twisted pair
jacket.
12 Close the PDU cover and torque the PDU cover screws from 50 in-lb to 60 in-lb
(5.6 Nm to 6.8 Nm).
13 Attach the coax cable to the tap‟s drop F-ports as desired. Make sure to tighten
according to the manufacturer‟s recommended torque specification.
Note: Provide strain relief for the coax drop cable per manufacturer‟s
recommendation.
14 Install 75  terminators on all unused ports of the faceplate.
4013399 Rev C
CAUTION:
Avoid damage to this product. Before installing any terminators, make sure
AC is not present on the drop ports.
Installing the Twisted Pair PDU
45

Advertisement

Table of Contents
loading

Table of Contents