AEG ME09 Installation, Operation And Maintenance Manual page 13

5000a-6400a
Table of Contents

Advertisement

STANDARD CONNECTION SCHEME FOR TERMINAL BLOCK A
Indica on:
LP1: Spring charge status
LP2: Breaker open
LP3: Breaker closed
LP4: Fault
LP5: Breaker ready to close
LP6: CC powered
LP7: UVR not powered
LP8: ST powered
LP9: ST2 powered / UVR2 not powered
LP10: Network Interlock lockout
LP11: Breaker in DISCONNECTED posi on
LP12: Breaker in TEST posi on
LP13: Breaker in CONNECTED posi on
CC: Closing coil
ST: Shunt release
UVR: Undervoltage release
SPR: Spring charge status
RTC: Ready to close status
M: Motor operator
BAT: Bell alarm trip
CCC: Command closing coil
NI: Network Interlock
BREAKER
BLOCK A
...more details see chapter 1.3.4
1.
1
1.1-08

Advertisement

Table of Contents
loading

Table of Contents