Ecg Check - GE Vivid T8 Basic Service Manual

Hide thumbs Also See for Vivid T8:
Table of Contents

Advertisement

General Procedures and Functional Checks
Step
4
Test the probe in each active connector slot.
5
Do a leakage test on the probe, See 'Electrical
safety tests' on page 10-19 for more information.
6
Repeat this procedure for all available probes.

ECG Check

Introduction
Parts needed
Preparations
ECG Check
Step
1
Connect the ECG harness to the connector
under the control panel.
2
Connect the three leads to an ECG simulator,
or
Fasten the three ECG Pads to your body and
connect the three leads to respective ECG
Pad.
4-32
Table 4-1:
Probe and Connectors Checks
Task
The ECG capability on this unit, is intended as use as a trigger
for measurements, but can also be viewed on the screen.
ECG Pads (3 pc)
ECG Cable Europe Kit (5505585) or US Kit (5505577)
None
Table 4-2:
Task
Expected Results
It will display pictorial data each time.
It passes the test.
ECG Checks
Expected Result(s)
The unit displays a straight curve along the
bottom edge of the image sector on the screen.
When connecting, the signal on the screen will
be noisy.
When the connection is completed, a typical
clean ECG signal is displayed.
Vivid T8/ Vivid T8 Pro – Basic Service Manual
5490863-100 English Rev. 03

Advertisement

Table of Contents
loading

Table of Contents