Download Print this page

Cisco 6100 Installation Procedures Manual page 48

Thermal upgrade kit

Advertisement

Installing the Cisco 6100 Thermal Upgrade Kit
Install the plastic ESD shield over the system I/O card using the following steps:
Step 3
Position the holes in the plastic ESD shield over the existing standoff screws installed on the
a.
system I/O card.
Use a Phillips-head screwdriver and the backplane screws you removed in the "Disconnect the
b.
Network Interface Modules" section on page 14 to attach the plastic ESD shield to the system I/O
card (see Figure 31).
Figure 31
Existing
backplane
screw
For step-by-step instructions on provisioning a Direct Connect configuration, refer to the
Tips
ViewRunner for Windows Direct Connect Provisioning Guide or the ViewRunner for HP
OpenView Direct Connect Provisioning Guide.
Cisco 6100 Thermal Upgrade Kit Installation Procedures
48
Plastic ESD Shield Installation
Existing
standoff
screw
DS3 TX
P1
DS3 RX
P2
P3
SEC
LAN
Existing
standoff
screw
ESD
shield
P5
PRI
System
I/O card
J 2
J 1
Standoff
screw
78-10158-01

Advertisement

loading