Download Print this page

Cisco 6100 Installation Procedures Manual page 27

Thermal upgrade kit

Advertisement

If you are migrating from dual-port to quad-port ATU-C modules, refer to the Cisco 6100
Note
with NI-1 Direct Connect Installation Guide for conversion procedures. Different cables
and an additional POTS splitter will be needed.
Attach Cisco 6100 Power Connections
To prevent the system from powering up, do not install the fuses at this time. If the fuses
Caution
are already installed in the fuse and alarm panel, remove them. You can replace the fuses
after the system is wired.
You can wire the power connections from the Cisco 6100 to the fuse and alarm panel for either dual- or
single-power feed.
The clear cover was removed in the "Disconnect the Cisco 6100 Power Connections"
Note
section on page 15.
Connect each Cisco 6100 Series system component to a separate fuse. Do not power the
Note
components in the rack by chaining them together.
78-10158-01
Installing the Cisco 6100 Thermal Upgrade Kit
Cisco 6100 Thermal Upgrade Kit Installation Procedures
27

Advertisement

loading