Cisco 6100 Installation Procedures Manual page 12

Thermal upgrade kit

Advertisement

Installing the Cisco 6100 Thermal Upgrade Kit
Measure Rack Space
When upgrading your system to accommodate dual-port DMT-2 or quad-port flexi ATU-C modules,
you may have to move the hardware components in the rack to accommodate the fan tray. Figure 1
shows the components for a Direct Connect with a POTS splitter configuration when you are using a
Cisco 6100 chassis. The fan tray is installed directly below the Cisco 6100 chassis.
Figure 1
Cisco 6100
(CAP, DMT-2,
Flexi ATU-Cs)
Fan tray
Cisco 6120
Two people are required to lift the chassis. Grasp the chassis underneath the lower
Warning
edge and lift with both hands. To prevent injury, keep your back straight and lift with
your legs, not your back.
Cisco 6100 Thermal Upgrade Kit Installation Procedures
12
Direct Connect with a POTS Splitter Configuration in the Cisco 6100
1 2 3 4 5 6 7 8 9
or
21 22 23 24 25 26 27 28 29
STATUS
1 2 3 4 5 6 7 8 9
Cisco 6100
12
10
11
13
14 15 16 17 18 19 20
30 31 32 33 34 35 36 37 38
STATUS
STATUS
10
11
12
13 14
15
16
17 18 19
20
Cisco 6120
Cisco 6100
21
22
78-10158-01