Cisco ONS 15310-MA SDH Procedure Manual page 29

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Chapter 1
Install the Cisco ONS 15310-MA SDH
Table 1-2
SFP
ONS-SI-155-L1
ONS-SI-155-L2
ONS-SI-155-I1
ONS-SI-622-L1
ONS-SI-622-L2
ONS-SI-622-I1
ONS-SE-155-1470
through
ONS-SE-155-1610
ONS-SE-622-1470
through
ONS-SE-622-1610
ONS-SI-2G-I1=
ONS-SI-2G-L1=
ONS-SI-2G-L2=
ONS-SI-2G-S1=
ONS-SC-2G-30.3=
through
ONS-SC-2G-60.6=
ONS-SE-2G-xxxx
ONS-SE-Z1
Step 2
As needed, complete the
page
16-23.
Step 3
As needed, complete the
on page
As needed, gently route the fiber cables away from the shelf. You might want to use the optional tie-down
Step 4
bar.
Continue with the
Step 5
Stop. You have completed this procedure.
78-18668-01
Optical Transmit and Receive Levels
Interface
STM1
STM1
STM1
STM4
STM4
STM4/STM1
STM1
STM4
STM16
STM16
STM16
STM16
STM16
STM16
STM1
STM4
STM16
"DLP-H18 Install Fiber-Optic Cables in a 1+1 Configuration" task on
"DLP-H19 Install Fiber-Optic Cables for Path Protection Configurations" task
16-24.
"NTP-H164 Perform the Shelf Installation Acceptance Test" procedure on page
Transmitter Output
Receiver Input Power
Power Min/Max (dBm)
Min/Max (dBm)
–5.0 to 0
–34 to –10
–5.0 to 0
–34 to –10
–15 to –8.0
–28 to –8
–3.0 to 2.0
–28 to –8
–3.0 to 2.0
–28 to –8
–15 to –8.0
–28 to–8
0 to +5
–34 to –3 (at BER 10
0 to +5
–28 to –3 (at BER 10
–5.0 to 0
–18 to –0
–3 to +2
–27 to –9
–3 to +2
–28 to –9
–10 to -3
–18 to –3
0 to +4
–28 to –9
-1 to +4 dBm
-9 to -29 dBm
-5 to 0 dBm
-10 to -23 dBm
-5 to 0 dBm
0 to -23 dBm
-5 to 0 dBm
-0 to -18 dBm
Cisco ONS 15310-MA SDH Procedure Guide, R9.0
Required Tools and Equipment
-10
)
-10
)
1-30.
1-29

Advertisement

Table of Contents
loading

Table of Contents