Required Tools and Equipment
Figure 1-5
Caution
Threading one jack screw completely before threading the other jack screw might result in connector
misalignment and damage to the EIA. Do not overtighten the jack screws.
Install the remaining three 6-32 x 5/16-inch pan head screws onto the EIA and torque to 8 to 10 in-lbs.
Step 6
Repeat Steps
Step 7
Step 8
Continue with the
Stop. You have completed this procedure.
NTP-H151 Install the Power and Ground
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Warning
This product requires short-circuit (overcurrent) protection, to be provided as part of the building
installation. Install only in accordance with national and local wiring regulations. Statement 1045
Warning
Read the installation instructions before connecting the system to the power source. Statement 1004
Cisco ONS 15310-MA SDH Procedure Guide, R9.0
1-12
EIA Jack Screw
Inner screw
Rotation indicator
Thumbscrew
2
through
6
to install the other EIA, as necessary.
"NTP-H151 Install the Power and Ground" procedure on page
This procedure describes how to install power feeds and how to ground the
ONS 15310-MA SDH.
Ground cable, #6 AWG stranded copper conductors, minimum
90 degrees C (194 degrees F)
Copper power cable (from fuse and alarm panel to assembly), #12 AWG
stranded copper conductors, minimum 90 degrees C (194 degrees F)
NTP-H150 Install the Shelf Assembly, page 1-5
Required
Onsite
None
Chapter 1
Install the Cisco ONS 15310-MA SDH
1-12.
78-18668-01

Advertisement

Table of Contents
loading

Table of Contents