Configuration at TPS Universal Station

Introduction
Configuration
assumptions
10/01
Once the FSC user software configuration has been successfully
completed, you will need to use the Universal Station (US) to finish
FSC-SM system configuration. This section will discuss the following
US configurations:
• Universal Control Network (UCN),
• Node-specific (FSC-SM device), and
• FSC-SMM data points.
This section covers the FSC-SM configuration process at the US. It
assumes that you have completed the implementation steps for start-up
and have prepared the History Module (HM) and the system for network
configuration.
Table 4-1 outlines the start-up process for the TPS system. If these
procedures have not been done, refer to the LCN bookset –
Implementation Startup & Reconfiguration, binder TPS 2030-1.
Table 4-1 – Start-up and reconfiguration procedures
Step
Action
Prepare the system for
1
network configuration.
2
Configure the network.
Prepare the History
3
Module.
FSC Safety Manager Installation Guide
Result
Universal Personality is in "this US". Current
time and date is in "this US". The system
start-up floppy is in a secure place.
A site-specific Network Configuration File
(NCF), required as input to subsequent
procedures, is available.
The History Module can now be used as a
source for configuration programs and data.
Continued on next page