Figure 1-8 Placement Of Equipment Onto Lumber; Table 1-4 Fork Lift Considerations - Honeywell FSC-SM Installation Manual

Safety manager
Table of Contents

Advertisement

1.4
Unpacking and Placement,
Fork lift
14
The FSC-SM cabinet is moved by fork lift to the final location. Table 1-4
lists special considerations regarding the use of a fork lift to move the
equipment.
Table 1-4 – Fork lift considerations
Number
1
Move the equipment to the electronics room by fork lift; remove the
fork lift by placing the equipment onto the lumber pieces by 10 cm
(4 inches) as illustrated in Figure 1-9.
Tip the cabinet off the lumber and onto the floor; remove the lumber.
2
Manually move the cabinet to the exact final position.
3
Figure 1-9 – Placement of equipment onto lumber
FSC Safety Manager Installation Guide
Continued
Consideration
Solid piece or combination
of lumber pieces to match skid
or pallet height (nail together).
Move cabinet onto the lumber.
Continued on next page
10/01