Download Print this page

Toshiba GR200 Series Instruction Manual page 93

Hide thumbs Also See for GR200 Series:

Advertisement

From Z1S to Z5S logics
SOTF-Z1S-OPT
SOTF-Z1XS-OPT
SOTF-Z2S-OPT
SOTF-Z3S-OPT
SOTF-Z4S-OPT
SOTF-Z5S-OPT
SOTF-Z1S-OPT-AB
SOTF-Z1S-OPT-BC
SOTF-Z1S-OPT-CA
SOTF-Z1XS-OPT-AB
SOTF-Z1XS-OPT-BC
SOTF-Z1XS-OPT-CA
SOTF-Z2S-OPT-AB
SOTF-Z2S-OPT-BC
SOTF-Z2S-OPT-CA
SOTF-Z3S-OPT-AB
SOTF-Z3S-OPT-BC
SOTF-Z3S-OPT-CA
SOTF-Z4S-OPT-AB
SOTF-Z4S-OPT-BC
SOTF-Z4S-OPT-CA
SOTF-Z5S-OPT-AB
SOTF-Z5S-OPT-BC
SOTF-Z5S-OPT-CA
Figure 2.1-44 SOTF-ZS grouping logic for TRC/Recording functions
ZG logic
(ii)
Figure 2.1-45 to Figure 2.1-50 to shows the ZG logics and corresponding SOTF logics. All logic
operations (Z1G, Z1GX, Z2G, Z3G, Z4G, and Z5G) can be selected using the scheme switches.
Scheme switch [Z*G-EFL] is used to select the EFL element for the detection of earth faults;
when the EFL element operates, detection of the PSB is canceled.
Scheme switch [Z*G-LPBlk] is used to enable blocking of the operation of the leading-
phase-block function. The ARC_BLOCK signals allow the Z*G element to perform final three-
phase tripping for all faults. The Z*G_3PTP configures the Z*G element to perform the three-
phase trip.
≥1
- 72 -
6F2S1915 (0.46)
To TRC
8300001B28
To DISCAR
SOTF-ZS-OPT-TRIP
SOTF-ZS-ARC-BLOCK
8C00001B66
≥1
SOTF-ZS-OPT-ABR
8D00001B67
SOTF-ZS-OPT-BCR
8E00001B68
SOTF-ZS-OPT-CAR
≥1
≥1
GRZ200 (Soft 031 & 032)

Advertisement

loading

This manual is also suitable for:

Grz200