6.2 Installation
No.
4
Put base in the soil according to installation height of the MastPanto
① Reference point pantograph/electric vehicle
② Reference point electric vehicle center (E =
③ Reference point curb
④ Reference point mast center ground
Figure 6-5
60
Checklist item
center
1250 ±10 mm + D)
Position MastPanto
A
Adjustment range of the pantograph
B
Contact rail height
C
Mast height clearance
D
Distance electric vehicle - curb (0 ... 100 mm)
E
Distance electric vehicle center - curb
F
Mast center - Pantograph center
G
Mast base center - Threaded rods
H
Mast base bottom edge - Road
I
Mast base bottom edge - curb top edge
(≤ 830 mm)
Installation and Commissioning Checklist for SICHARGE