Installation - Siemens SICHARGE UC Installation And Commissioning Manual

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

SICHARGE UC MastHood

5.2 Installation

5.2
Installation
Preparing the mounting area
No.
1
Prepare for foundation and check that the mounting direction of the mast and the driving direc-
tion of the bus correspond with the installed cable connection in the contact hood.
2
Create foundation according the interface description below
3
Put foundatin in the soil according to installation height of the MastHood (see picture below)
4
Before mounting, remove foreign bodies and dirt from the mounting surface
5
Check the threaded rods for damage and dirt. Clean and repair the threaded rods
6
Screw 2 nuts on each threaded rod
7
Place a washer on the nuts
8
Align the nuts with a level
9
Make sure that the position of the nuts matches the position of the mast planned in the project for
its location
10
Mark the position of the nuts
42
Checklist item
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
P
F
N/A

Advertisement

Table of Contents
loading

Table of Contents