Chapter 7 • Hydran 201Ci-C Installation
• Ensure the Communications Status indicator (yellow, DS6; item 23 in Figure 3-3 on
page 3-5) flickers inside each H201Ci-C when the host computer communicates with
any H201Ti of the H201Ci-C.
12. When the test is completed, in the Relays/Analog window of the Hydran Host
software, restore the Relay Mode of each relay to Normal.
13. Disconnect all communication cables (supervisory links, RS-485 LAN and RS-232
to the PC).
14. Restore the original communication settings in each H201Ti as noted in the step 4
above.
7.2.4

Completing the Verification

This completes the incoming verification of the Hydran 201Ci-C.
1.
Disconnect all the H201Ti's from the power outlets.
2.
Disconnect all the H201Ci-C's from the power outlets.
3.
Remove all supply cables.
4.
Remove all communication cables.
5.
Store the H201Ti's and the H201Ci-C's in their respective boxes, ready for instal-
lation.
6.
If the H201Ti's are not installed immediately, refer to Section 6.1.4 on page 6-5.
7.
If the H201Ci-C's are not installed immediately, refer to Section 7.1.3 on page 7-2.
7.3

INSTALLATION

This Section explains how to install the Hydran 201Ci-C Controller.
Read all the warnings and recommendations in Section 5.1 on
WARNING
CAUTION
page 5-1 before proceeding with the installation.
7-6
Rev. 6, March 2011