Overview Of The Configuring Steps To Be Performed - Siemens SIMOTION D4x5-2 DP/PN Operating Instructions Manual

Hide thumbs Also See for SIMOTION D4x5-2 DP/PN:
Table of Contents

Advertisement

Configuration

5.2 Overview of the configuring steps to be performed

Checking the system cycle clocks
The task runtime settings must also be checked. The "Simotion" entry must be selected in
SCOUT for this purpose. The "Set System Cycle Clock" shortcut menu should be used to set
the system cycle clocks as shown in the following screenshot.
Figure 5-1
5.2
Overview of the configuring steps to be performed
The following steps must be performed in succession:
1. Performing setup (Page 111) (installation of the DCC library)
2. Importing the (SCOUT) application project of the AddOn technology (Page 111)
3. PROFINET configuration (Page 112) and pasting the MV440 camera into the hardware
configuration
4. Copying the address list (Page 121)
5. Copying the AddOn FB library (Page 123)
6. Copying MCC source files (Page 126)
7. Inserting DCC blocks (Page 127)
8. Establishing the connection between Basic Technology and AddOn (Page 131)
9. Connection between active skew technology object and DCC block TLS2 (Page 132)
10.Linking the "AddOn" and "Camera" programs into the execution system (Page 134)
11.Saving, compiling, and checking consistency (Page 134)
12.Downloading the user project to the CF card (Page 135)
13.Transferring language files, online help files, and JAVA files to the CF card (Page 138)
14.Creating the license key and downloading it to the CF card (Page 140)
15.Communication test for the STS application project (Page 141)
110
Setting task runtimes
SC integrated STS, GSU
Operating Instructions, 07/2019, A5E48271265B AA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics

Table of Contents