4 Commissioning
4.2
Initial start–up
4.2.4

PLC startup

4-22
To start up the PLC you must first create and then load a PLC user project.
To start up the PLC proceed as follows:
If tool management has not yet been set up
implement call FC8 and create the PLC data
(DB4) (see Section 8.4 "PLC start–up").
For example compile a source file:
TM_REV_GR.AWL or TM_REV_UK.AWL
(data transfer for machine with turret).
The example file is located on the Toolbox in
subdirectory 8x0d under \ShopMill_Turn.
Download PLC user project to PLC
Fig. 4-2
PLC commissioning
SINUMERIK 840D sl Commissioning Manual CNC: ShopTurn – 11/2006 Edition
Load the basic PLC program
© Siemens AG 2006 All Rights Reserved