Table Of Correspondences - Ironer 3,2 M - Electrolux IC4 4819 FFS Service Manual

Feeder ironer folder & stacker
Table of Contents

Advertisement

10

Table of correspondences - Ironer 3,2 m

Categories
Type of
index
gas
*2E,
2H,
G 20
2ESI
2L,
G25
2ESI
G30
3 +
G31
3 P
G31
* For Belgium, no work is allowed between G20 and G25.
Note :
G20 (H) = natural gas, Lacq type (20 mbar)
G25 (L) = natural gas, Groningue type (20 or 25 mbar)
G30 (H) = butane gas (28/30, 50 mbar)
G31 = propane gas (28/30, 37, 50 mbar)
18
Installation
Working
supply
Hi
injectors
pressure
in MJ/m³
in mbar
20
34,02
25
29,25
28-30
45,65
37
46,34
50
46,34
IMPORTANT
Tightness test after installation
The gas leak test is performed as follows :
1/ Paint pipe joints, pilot gas tubing connections and inspect
outlets with rich soap and water solution; do not use an
aggressive soap.
2/ Put the machine into service. Bubbles indicate a gas leak.
3/ Eliminate this leak.
Check-out
Before leaving, put the appliance into operation and allow to run a
complete cycle. Watch to ensure that all burner system components
function correctly.
Heat
Ø of
Pressure at
emission
injectors
Qn in kW
in mm
in mm H
O
(Hi)
2
4,00
114
4,00
160
2,30
-
2,30
-
2,10
-
Consumption
Consumption
Mn in kg/h
65
-
65
-
65
4,10
65
4,04
65
4,04
04102011/GB
Service
Manual
Vn in m³/h
6,87
7,99
-
-
-
51.2010

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ic4 4825 ffsIc4 4832 ffs

Table of Contents