Step 5: Confirm Installation Configuration; Figure 6-19 Step 5: Confirm Configuration Page - Motorola PTP 250 User Manual

Power over ethernet injector unit, poe power supply
Hide thumbs Also See for PTP 250:
Table of Contents

Advertisement

PTP 250 User Guide

Step 5: Confirm installation configuration

Step 5 of the Installation wizard is for reviewing and confirming the updated attributes
(Figure
6-19).
If any of the attributes are incorrect, select Back to return to previous steps and
update them.
If all attributes are correct, choose one of the following options:
x
If antenna alignment tones are not wanted, select Finish. This is the preferred
option before bench testing the units.
x
If antenna alignment tones are wanted, select Set Armed and Yes to confirm.
This is the preferred option before site installation and antenna alignment.

Figure 6-19 Step 5: Confirm Configuration page

NOTE
phn-2182_002v000
May 2011
If the IP Address, Subnet Mask or Gateway IP Address of the unit have been
updated to meet network requirements, then reconfigure the local
management PC to use an IP address that is valid for the network. Refer to
Configuring the management PC
Using the installation wizard
on page 6-3.
6-23

Advertisement

Table of Contents
loading

Table of Contents