PTP 250 User Guide
9
Prepare the metal grounding point of the supporting structure to provide a
good electrical contact with the grounding cable:
Installing and grounding the drop cable at building entry
Perform this procedure to install and ground the drop cable and LPU at the building
(or cabinet) entry point
Figure 5-11 Grounding at building entry
phn-2182_002v000
May 2011
Remove paint, grease or dirt, if present.
Apply the anti-oxidant compound liberally between the two metals.
(Figure
5-11).
Installing the drop cable and LPU
5-25