*Note*
This command only issues the instruction to power-on.
The result of the instruction can be checked by the
"showpparprogress".
Note - In the SPARC M10-1, a physical partition takes about 5 minutes to start. In the SPARC
M10-4, it takes about 7 minutes. In the SPARC M10-4S in the 4BB configuration, it takes
about 25 minutes.
3.
Execute the showpparprogress command.
You can check the progress, in the midst of processing, between physical
partition power-on and up to before the start of POST.
Confirm that the command displays "The sequence of power control is
completed." and ends.
Note - Oracle Solaris does not start automatically because the auto-boot? setting is false.
XSCF> showpparprogress -p 0
PPAR Power On Preprocessing PPAR#0 [ 1/12]
PPAR Power On PPAR#0 [ 2/12]
XBBOX Reset PPAR#0 [ 3/12]
PSU On PPAR#0 [ 4/12]
CMU Reset Start PPAR#0 [ 5/12]
XB Reset 1 PPAR#0 [ 6/12]
XB Reset 2 PPAR#0 [ 7/12]
XB Reset 3 PPAR#0 [ 8/12]
CPU Reset 1 PPAR#0 [ 9/12]
CPU Reset 2 PPAR#0 [10/12]
Reset released PPAR#0 [11/12]
CPU Start PPAR#0 [12/12]
The sequence of power control is completed.
XSCF>
4.
Execute the showdomainstatus command, and confirm that status is
"OpenBoot Running".
XSCF# showdomainstatus -p 0
Logical Domain Name Status
primary OpenBoot Running
XSCF#
5.
Execute the console command to connect to the console of the specified
physical partition.
The auto-boot? setting is false, so you can confirm the start up to the ok prompt.
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
224