2.2 Preparatory Procedures for Monitoring

The following shows the procedures before monitoring and corresponding reference sections.
Install the OS on the GOT.
Make sure that the OS is installed on the GOT.
Set the communication interface. (Communication
settings)
Download the project data.
Mount the communication unit and connect the cable.
Make sure that the GOT recognizes controllers.
Make sure that the GOT correctly monitor the
controllers.
2 - 4
2.2 Preparatory Procedures for Monitoring
Checking programmable controller settings
This section describes GOT settings.
For checking programmable controller settings, refer to the following.
Section 2.3 Programmable Controller Settings
Section 2.2.1
Installing OS on GOT
Section 2.2.2
Checking OS installation on GOT
Section 2.2.3
Setting communication interface
(Communication settings)
Section 2.2.4
Downloading project data
Section 2.2.5
Mounting communication unit and
connecting cable
Section 2.2.6
Checking if GOT recognizes controllers
Section 2.2.7
Checking if GOT correctly monitors
controllers