5.
Repeat steps 1 through 4 for each host.
6.
From the SP, type exit to stop the CLI session, then type x and press Enter to return to the
SP main menu. Type x and press Enter again to exit. Type exit and press Enter to log off
the SP. Disconnect the cables between the SP and the maintenance PC.
Exporting Test LUNs
53