Device Startup - Siemens SITRANS FS130 Compact Operating Instructions

Ultrasonic flowmeters
Table of Contents

Advertisement

5.4

Device startup

Condition
You have read the Basic Safety Notes (Page 85).
Procedure
1. Power-on the device.
For an initial startup, prompts for each of the following steps appear after power-on.
2. Set the language.
The first time the device is configured, you will be prompted to set the language. The
parameter "Language" always appears in English. To change the language again (after initial
setup), see parameter Language in FST030 HMI export in SIOS
support.industry.siemens.com/cs/document/109793928).
3. Set the date and time.
The correct date and time should be set prior to configuring the device.
4. Run the "Quick commissioning wizard".
Essential parameters should be considered before using the device for the first time.
For any subsequent startup, after power-on, the device automatically starts in operation
view. A transition screen showing first the Siemens logo and then the current firmware
revision of the product is displayed while the first measurement is being processed.
SITRANS FS130 & FS230
Compact Operating Instructions, 12/2023, A5E38755607-AF
Commissioning
5.4 Device startup
(https://
89

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sitrans fs230

Table of Contents