4. Apportioned electricity billing function trial run
procedure in the BACnet
4-1. Entire trial run flow
Perform a trial run according to the following procedure.
Check timing
Before billing function
trial run
1st run check (after
air conditioning unit
continuous operation
for more than 2
hours)
2nd run check
(at least 10 days
after the 1st billing
function trial run)
3rd run check (at
least 1 month after
the 2nd billing
function trial run)
WT08246X03
Procedure explained in the
Step
AE-200/AE-50/EW-50 Instruction Book
–Apportioned Electricity Billing Function–
1
7-1. "Flow of the billing function trial run"
2
7-2. "Checking the billing function settings
3
(check before billing function trial run)"
4
7-2-1. "Billing-related item sheet"
5
7-2-2. "Unit-related item sheet"
6
7-2-3. "Entering the electric energy"
7
8
Run each indoor unit continuously for at least 2 hours as explained in the AE-200/AE-50/
EW-50 Instruction Book –Apportioned Electricity Billing Function–
At 00:00 or later on the day of the 1st run check (after air conditioning unit continuous
operation), run each indoor unit continuously for at least 2 hours.
9
7-3. "Billing function trial run checks"
7-3-1. "1st run check (after air
10
conditioning unit continuous operation)"
[1] "Billing-related item sheet"
11
7-3-1. "1st run check (after air
12
conditioning unit continuous operation)"
[2] "Unit-related item sheet"
13
14
7-3-2. "2nd run check (at least 10 days
15
after 1st billing function trial run)"
16
7-3-3. "3rd run check (at least 1 month
17
after the 2nd billing function trial run)"
18
19
7-4. "Final checks"
7-4-1. "Final checks for the operation
20
settings"
21
7-4-2. "Final report"
®
function
Procedure explained in this manual
←
4-2-1 "BACnet
←
←
←
←
4-2-2 "Billing-related item sheet (BACnet
4-2-3 "Unit-related item sheet (BACnet
←
←
4-3-1 "Billing-related item sheet (BACnet
←
4-3-2 "Unit-related item sheet (BACnet
4-3-3 "Checking the match with the CSV data
(apportioned results) of the AE-200"
←
4-4 "BACnet
days after the 1st billing function trial run)"
←
4-5 "BACnet
after the 2nd billing function trial run)"
←
←
←
9
®
metered value correction"
(2nd run check (at least 10
®
®
(3rd run check (at least 1 month
®
)"
®
)"
®
)"
®
)"