Mitsubishi Electric AE-200A Instruction Book page 18

Air conditioning control system
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

[4] Checking the trend log object
®
⑥ Use BACnet
Apportioned Electric Energy" (LOG_01xx83) or "Trend Log Interlocked Units Apportioned Electric Energy"
(LOG_61aa83) objects. Check that the "Present_Value" property values of the "Group Apportioned Electric
Energy" (AC_01xx39) or "Interlocked Units Apportioned Electric Energy" (AC_61aa39)" objects are stored
in the "Log_Buffer" property at the interval set in the "Log_Interval" property, and that there is no abnormal
data, such as a decrease in the value.
Note
For details on the procedures for operating BACnet
to the AE-200/AE-50/EW-50 Instruction Book –BACnet
WT08246X03
Trial Run Tool and read the "Log_Buffer" property values of the "Trend Log Group
®
Trial Run Tool and checking the trend log object, refer
®
Trial Run Tool–.
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-200eAe-50aAe-50eEw-50aEw-50e

Table of Contents