Mitsubishi Electric AE-200A Instruction Book page 15

Air conditioning control system
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

®
4-3. BACnet
(1st run check (after air conditioning unit continuous
operation)
4-3-1. Billing-related item sheet (BACnet
Billing-related item sheet (entire view)
Billing-related item sheet (enlarged view)
[1] Entering the metering device electric energy value (after a trial run)
Read the metering device electric energy value at XX:00 or XX:30 minutes of any hour after at least 2 hours
have passed since the start of the billing trial run.
① Enter the checked date and time. (XX:00 or XX:30 minutes)
② Enter the meter display value of the metering device.
®
[2] BACnet
function: Entering the metering device electric energy value (after a trial run)
Enter the electric energy value after the trial run in the AE-200 BACnet
after 20 to 40 minutes have passed since [1] (for example, between 10:20 and 10:40 if the metering device value
was read at 10:00, or between 10:50 and 11:10 if the value was read at 10:30).
③ Enter the checked date and time.
®
④ Use BACnet
Energy 1–4" (AC_41mm40–AC_41mm43) or "Pulse Input Electric Energy 1–4" (AC_410040–AC_410043)
objects and enter the electric energy values after the trial run.
"Present_Value" property value × 0.1 = Electric energy [kWh]
Note
For how to operate BACnet
Trial Run Tool–.
WT08246X03
[6]
[1]
[3]
Trial Run Tool and read the "Present_Value" property values of the "PI controller Electric
®
Trial Run Tool, refer to the AE-200/AE-50/EW-50 Instruction Book –BACnet
®
)
[3]
[2]
®
function in the billing-related item sheet
15
[1] [3]
[2]
[4]
[3]
[5]
[4]
[5]
®

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-200eAe-50aAe-50eEw-50aEw-50e

Table of Contents