4-4. BACnet
(2nd run check (at least 10 days after the 1st billing function
trial run)
As with the 1st trial run, perform a check for the period from the first billing trial run until work begins.
For the procedure, refer to 4-3-1 "Billing-related item sheet (BACnet
®
(BACnet
)".
®
4-5. BACnet
(3rd run check (at least 1 month after the 2nd billing function
trial run)
As with the 1st trial run, perform a check for the period from the second billing trial run until the closing date.
For the procedure, refer to 4-3-1 "Billing-related item sheet (BACnet
®
(BACnet
)".
WT08246X03
®
)" and 4-3-2 "Unit-related item sheet
®
)" and 4-3-2 "Unit-related item sheet