Save the removed bolts for future use.
Step 2 Remove the side panels.
Figure 4-24 Removing side panels
Step 3 Four to six persons are required to move the cabinet to the installation position.
Figure 4-25 Force-bearing position
(1) Force-bearing beam
Step 4 Install the side panels.
----End