connector on the operation panel side.
Perform this step only when you remove the cable (SIG).
If you remove the cable (PWR), proceed on to Step 10.
Figure B-19
10. Remove the cable from the terminal board.
■
Fujitsu M10/SPARC M10 Systems Product Notes for XCP Version 2043 ・ October 2013
148
Operation panel cables
For the cable (PWR), push the connector toward the far end, while pushing
the lower latch (A in the figure) upward with a flathead screwdriver.
Confirm that the lower latch (A in the figure) is pushed into the inside of the
terminal board. Push the connector toward the far end, while pushing the
upper latch downward with the flathead screwdriver.
Front