Gs4000-160E1 - Hitachi GS4000 Series Installation Manual

Hide thumbs Also See for GS4000 Series:
Table of Contents

Advertisement

4.12.2 GS4000-160E1

(1) Powering on the GS4000-160E1
Use the following procedure to power on the GS4000.
High port-density PSU-integrated NIF are NOT installed in the GS4000
Set all the switches of GS4000-160E1 to ON.
*
*
520-10-026-30X
NOTE: Make sure that the required number of power supply modules are mounted in
the GS4000 before powering it on.
For details, see the section "1.1 Chassis".
NOTE: When powering ON, set all the switches of GS4000 to "ON" within an 8 seconds
time period. Otherwise, the basic control unit (BCU) might detect a conflict
between the configuration and the actual number of active power sources. In this
case, fix the problem by complying with the following
Status
BCU LED:
GREEN (ON)
PSU LED :
GREEN (ON)
STATUS CODE:
22
BCU LED:
RED (ON)
PSU LED :
OFF
STATUS CODE:
22
GS4000 Installation Guide Revision 4.00
instructions.
Instructions
The device can work.
Before starting to use it, set all the switches
to ON. (An abnormality in power supply will
be resolved and the display of the STATUS
CODE "22" will disappear.)
Due to the lack of capacity of the power
supply modules, the GS4000 cannot become
active.
In this case, the power supply should be
reset, by cycling all the switches of the
GS4000 to "OFF" and then back to "ON" .
Before turning off power sources, carefully
read the caution messages/notes in the
section "(2) Powering off the GS4000-160E1"
below.
4-45

Advertisement

Table of Contents
loading

Table of Contents