Panasonic EBL512 G3 Planning Instructions page 23

Fire alarm system
Hide thumbs Also See for EBL512 G3:
Table of Contents

Advertisement

Panasonic Eco Solutions Nordic AB
MEW01472
Rev: -
Planning Instructions Fire alarm system EBL512 G3, United version 2.7.x
Figure 2. The EBL512 G3 front with display ("Man-Machine-
Interface"); The Fire Brigade Panel (FBP) is the upper part and
the Control Panel (CP) is the lower part. The look might vary
depending on the language, country, etc. (A front with texts in
English is shown in the figure).
The FBP is used by the fire brigade personnel to see which alarm
point(s) / zone(s) having activated fire alarm and to take required
operational control of the system.
information displayed in the upper part is depending on how many
alarm points / zones having activated fire alarm. In the middle part
will the fire alarms be shown, i.e. one alarm point or one zone together
with a user definable alarm text (if programmed) plus some other
information.
External FBPs are also available.
The CP is to "communicate" with the system, i.e. for commissioning,
monthly tests, maintenance, etc. Access codes for different access
levels are required. A keypad is used to get access to the system (a
menu tree with main and sub menus) and for operational control of the
system. The CP has several system status LEDs.
NOTE! Regarding LED indicators, keypad / push buttons / soft keys,
access levels and for more information, see EBL512 G3 Operating
Instructions MEW01473.
In the graphical display, the
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents