Setup Reminders; Average Setup Time; Setup Warnings - GE Vivid T8 Basic Service Manual

Hide thumbs Also See for Vivid T8:
Table of Contents

Advertisement

3-2-1 Average setup time

3-2-2 Setup warnings

DANGER
CAUTION
CAUTION
CAUTION
Vivid T9/Vivid T8 – Basic Service Manual
5795591-100 English Rev. 3

3-2 Setup reminders

Unpacking the Vivid T9/Vivid T8: 20 minutes
Set up Vivid T9/Vivid T8 options: 15 minutes
DICOM Network Configuration: 30 minutes or more,
depending on the configuration
Install Insite: 0.5 hour
The Vivid T9/Vivid T8 installation and functional checkout will
take approximately 1 hour. Vivid T9/Vivid T8 consoles with
optional equipment may take slightly longer.
WHEN USING ANY TEST INSTRUMENT THAT IS CAPABLE
OF OPENING THE AC GROUND LINE (I.E., METER'S
GROUND SWITCH IS OPEN), DON'T TOUCH THE
ULTRASOUND SYSTEM!
To prevent electrical shock, connect the unit to a properly
grounded power outlet. DO NOT use a three to two prong
adapter. This defeats safety grounding.
DO NOT wear the ESD wrist strap when you work on live
circuits and more than 30 V peak is present.
DO NOT operate this unit unless all board covers and frame
panels are securely in place. System performance and cooling
require this.

Setup reminders

3-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid t9

Table of Contents