Download Print this page

Huawei FusionModule1000A40 Initial Configuration Parameter Manual page 91

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:

Advertisement

System capacity
Requisite modules
Advanced Param.
Redundant modules
BSC mode
Maximum
Bypass Param.
bypass voltage
BCB connection
Dry Contacts
Batter breaker
Battery Param.
Installation time
PDU Data-PDU-A/C-Branch
breaker open alarm enable
PDU Data-PDU-IT1-Branch
breaker open alarm enable
Settings
PDU Data-PDU-IT2-Branch
breaker open alarm enable
PDU Data-Main input 3-phase
cur. Imb
/
/
/
Non-BSC
voltage level is
+15%
208 V
voltage level is
+15%
220 V
voltage level is
+10%
230 V
Disable
Disable
/
Enable
Enable
Enable
Enable
/
/
/
Master BSC mode, Non-BSC mode, Slave
BSC mode
+10%, +15%, +20%, +25%
+10%, +15%, +20%
+10%, +15%
Disable/Enable
Disable/Enable
/
Disable/Enable/User-defined
Disable/Enable/User-defined
Disable/Enable/User-defined
Disable/Enable/User-defined
60 kVA
3
0
Master BSC mode (UPS-1)\Slave BSC mode
(UPS-2)
Default value
Default value
Default value
Disable
Disable
Set by service personnel
User-defined (After setting the parameter to
User-defined, disable the spare branch circuit
breaker in the Installation time PDU > Branch
Battery conceptual diagram and enable the
branch circuit breaker that connects to a load.)
User-defined (After setting the parameter to
User-defined, disable the spare branch circuit
breaker in the Installation time PDU > Branch
Battery conceptual diagram and enable the
branch circuit breaker that connects to a load.)
User-defined (After setting the parameter to
User-defined, disable the spare branch circuit
breaker in the Installation time PDU > Branch
Battery conceptual diagram and enable the
branch circuit breaker that connects to a load.)
Disable

Advertisement

loading