PDU Data-PDU-A/C-Branch breaker
open alarm enable
PDU Data-PDU-IT1-Branch breaker open
alarm enable
Settings
PDU Data-PDU-IT2-Branch breaker open
alarm enable
PDU Data-Main input 3-phase cur. Imb
Enable
Disable/Enable/User-defined
Enable
Disable/Enable/User-defined
Enable
Disable/Enable/User-defined
Enable
Disable/Enable/User-defined
User-defined (After setting the parameter to User-
defined, disable the spare branch circuit breaker in
the Installation time PDU > Branch Battery
conceptual diagram and enable the branch circuit
breaker that connects to a load.)
User-defined (After setting the parameter to User-
defined, disable the spare branch circuit breaker in
the Installation time PDU > Branch Battery
conceptual diagram and enable the branch circuit
breaker that connects to a load.)
User-defined (After setting the parameter to User-
defined, disable the spare branch circuit breaker in
the Installation time PDU > Branch Battery
conceptual diagram and enable the branch circuit
breaker that connects to a load.)
Disable

Advertisement

loading