288
Appendix D: Options
Appendix D: Options
MB02R96 Peak Meter Bridge
Installation
Unscrew the four fixing screws
1
meter bridge will be attached.
1
2
Using the four supplied 8 mm screws
bridge, as shown below.
Align the meter bridge with the 02R96, and, using two of the supplied
3
12 mm screws
fully.
4
Screw in the bottom two screws
Fully tighten the top two screws
5
Connect the meter bridge cable to the 02R96's METER port.
6
3
02R96—Owner's Manual
1
on the 02R96 rear panel to which the
C
, screw in the top two fixing screws, but don't tighten them
C
C
2
3
B
, attach the brackets to the meter
and tighten them fully.
.
2
1